Projects
Paving inside the slaughterhouse and on the Shorbat and Sanad 2 roads
Paving in the district covered the slaughterhouse, the Shorbat road, Masaken El Horreya, the Sanad 2 road and El Amn El Markazi Street.
What’s new
4 stories · Projects
Projects
Paving in the district covered the slaughterhouse, the Shorbat road, Masaken El Horreya, the Sanad 2 road and El Amn El Markazi Street.
Projects
The Merghem project stalled from 2008; the Merghem 1 plastics complex opened in 2018, and Merghem 3 is being built.
Projects
The Shorbat bridge road and El Arawa Street were paved under the district’s investment plan.
Projects
Three sewage lift stations are being built at Merghem Qibli, linked to the Merghem lift station.